Fast Palletiser Installation: Real Customer Experiences of Going Live in Under 48 Hours

How long does it take to install a palletiser? For our customers, the answer was less than 48 hours from uncrating to stacking the first case on a pallet — not the 2+ weeks of downtime they were quoted elsewhere.

In this short video, real customers share their experience of a Granta installation — from arrival on site to full automation.

Most companies dread automation installs because of the production downtime. But it doesn’t have to be that way. Here’s what the video covers.

Installed by the end of day one

One customer was quoted a minimum of two weeks’ installation time elsewhere, with multiple engineers on site. Our team had their system installed by the end of the first day. A big reason for that speed is our patented modular palletiser design — the system arrives largely pre-built and pre-tested, so time on your factory floor is kept to a minimum.

Picking its first case in under 48 hours

From the moment the system arrived and was uncrated, to the moment it picked its first case and stacked it on a pallet, took less than 48 hours. That’s what installation should look like: measured in days, not weeks.

Three days of hands-on, on-site training

A fast install means nothing if your team can’t run the machine confidently. At one customer’s site in Whitton, our engineers stayed for three days of hands-on training, helping both the engineering and production teams set up and fully automate the machine.

Staying on to iron out integration issues

Our team then stayed a further day to supervise live operation — and resolved communication issues between the palletiser and other parts of the production line’s control system before leaving site. Integration problems are dealt with there and then, not left for you to discover on Monday morning.

Immediate post-installation support

When questions came up after the install, the response was immediate. As one customer put it, our engineers came out, sorted any problems quickly, and trained their staff thoroughly on every feature they asked for.

What installation should look like

Fast installation, thorough operator training, and responsive after-sales support — so your team actually succeeds with the machine. If you’re a manufacturer or production manager looking at case palletising, bag palletising or end-of-line automation with minimal downtime, this is how it should be done.

Want to know how quickly a palletiser could be up and running in your factory?

Contact us, call us on 01223 499488, email helpline@granta-automation.co.uk, or book a free site visit through our website.

Bag PalletiserBag Palletiser
Barrel PalletiserBarrel Palletiser
Box PalletiserBox Palletiser
Crate PalletiserCrate Palletiser
Tray PalletiserTray Palletiser

This entry was posted in Auto Palletiser, Automated Container Unloading, Automated Palletising, Bag Palletiser, Box Palletiser, Cobot Palletiser, Compact Palletiser, Company news, Container Destuffing, Container Destuffing Palletising, Container Unloading Palletising, Depalletising, Granta Updates, Modular Palletiser, Palletiser, Palletiser - Granta Palletiser System, Palletising, Robotic Palletiser, Robotic Palletising, Small Palletiser and tagged , . Bookmark the permalink.