{"id":573,"date":"2017-02-23T15:22:18","date_gmt":"2017-02-23T15:22:18","guid":{"rendered":"https:\/\/www.granta-automation.co.uk\/news\/?p=573"},"modified":"2023-10-09T14:31:42","modified_gmt":"2023-10-09T14:31:42","slug":"2-ways-to-measure-the-productivity-effectiveness-or-efficiency-of-your-machinery-or-factory","status":"publish","type":"post","link":"https:\/\/www.granta-automation.co.uk\/news\/2-ways-to-measure-the-productivity-effectiveness-or-efficiency-of-your-machinery-or-factory\/","title":{"rendered":"2 Ways to Measure the Productivity, Effectiveness or Efficiency of your Machinery or Factory"},"content":{"rendered":"<p><a href=\"https:\/\/www.granta-automation.co.uk\/news\/wp-content\/uploads\/2017\/02\/2-Feb.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-574 size-full\" src=\"https:\/\/www.granta-automation.co.uk\/news\/wp-content\/uploads\/2017\/02\/2-Feb.jpg\" alt=\"2-Feb\" width=\"500\" height=\"333\" srcset=\"https:\/\/www.granta-automation.co.uk\/news\/wp-content\/uploads\/2017\/02\/2-Feb.jpg 500w, https:\/\/www.granta-automation.co.uk\/news\/wp-content\/uploads\/2017\/02\/2-Feb-300x200.jpg 300w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/p>\n<p>With productivity being a <a href=\"https:\/\/www.granta-automation.co.uk\/news\/theresa-may-tackles-productivity-to-increase-prosperity\/\">hot topic<\/a> at the moment it\u2019s important to know how to calculate the productivity of your machinery and factory to enable you to implement and track productivity improvements.<\/p>\n<p>This article covers two productivity calculations.\u00a0 The first is a Basic Productivity Calculation based on output and input, whereas the second is a more comprehensive productivity calculation based on Overall Equipment Effectiveness.<\/p>\n<p><strong>Basic Productivity Calculation<\/strong><\/p>\n<p>Basic productivity is calculated by comparing the amount of goods and services produced by the inputs that were used in production.\u00a0 This results in a basic productivity formula of;<\/p>\n<p><strong>Productivity = Output\/Input<\/strong><\/p>\n<p>This basic productivity formula can be used to calculate the productivity of your complete production process, or of a particular process or machine within your production process.<\/p>\n<p><strong>Output <\/strong>must be expressed as a numerical value, and is the finished value of goods or services produced by a person, machine, or process.<\/p>\n<p><strong>Input<\/strong> must also be expressed as a numerical value and is the value of input that was used to produce the output, such as labour, materials, machine time.<\/p>\n<p><strong>Worked Example<\/strong><\/p>\n<p>The widget making machine produces 100 units a day, the finished value of each unit is \u00a310.00.\u00a0 This means that the output of the machine is \u00a31000.00 per day.<\/p>\n<p>The total cost to make 1 widget is \u00a32.50.\u00a0 This cost includes \u00a31.50 of materials, \u00a30.50 of labour and \u00a30.50 of machine time.\u00a0 This means that the total input cost for 100 units is \u00a3250.00.<\/p>\n<p>So the basic productivity calculation is \u00a31000\/\u00a3250 = 4.\u00a0 Therefore the productivity for this machine on this particular day is 4.\u00a0 Having established a productivity factor for this particular machine, it is then possible to use this same formula to compare the productivity of identical work stations, or to monitor the productivity of this particular machine over time.<\/p>\n<p><strong><a href=\"https:\/\/www.granta-automation.co.uk\/basic-productivity-calculator-tool-download\" target=\"_blank\" rel=\"noopener\">Click here to download your FREE Basic Productivity Calculator Tool.<\/a><\/strong><\/p>\n<p>For more detailed information on this basic productivity calculation, read this clear guide by Accel:\u00a0 <a href=\"http:\/\/www.accel-team.com\/_pdf\/atpdf_08_extract.pdf\">http:\/\/www.accel-team.com\/_pdf\/atpdf_08_extract.pdf<\/a><\/p>\n<p><strong>OEE (Overall Equipment Effectiveness) Calculation<\/strong><\/p>\n<p>For a more comprehensive productivity calculation OEE should be used.\u00a0 OEE takes into account the speed at which the machine or factory runs, the quality of the finished products produced and the actual machine operating time versus the available operating time. OEE is best calculated per machine rather than across the whole factory as it is then easier to identify where improvements need to be made to help improve productivity. OEE is calculated as:<\/p>\n<p><strong>Performance x Availability x Quality<\/strong><\/p>\n<p><strong>Performance <\/strong>is the speed at which the machine or work station runs expressed as a percentage of the speed it is designed to run.<\/p>\n<p><strong>Availability<\/strong> is the asset operating time expressed as a percentage of available operating time.<\/p>\n<p><strong>Quality <\/strong>is the total number of good units produced expressed as a percentage of the total number of units that were started.<\/p>\n<p><strong>Worked Example<\/strong><\/p>\n<p><strong>Availability<\/strong> \u2013 The widget making machine is capable of producing 100 units every hour.\u00a0 The production day is 8 hours, so the machine is capable of producing 800 units per working day.\u00a0 But, today there is a downtime of 1 hour due to maintenance and a shortage of materials so this means that the machine will only be working for 7 hours.<\/p>\n<p>Actual Operating Time (7 hours)\/Available Operating Time (8h hours) = Availability of 87.5%<\/p>\n<p><strong>Performance <\/strong>\u2013 During the 7 hours of operating time that were available today, the machine produced 625 units.\u00a0 The amount of units the machine is able to produce within an hour is 100.\u00a0 So the theoretical time need to produced 625 units is 625\/100 = 6.25 hrs.\u00a0 The performance of the machine is;<\/p>\n<p>Theoretical time (6.25 hrs)\/Available time(7 Hrs) = 89% Performance<\/p>\n<p><strong>Quality<\/strong> \u2013 Of the 625 units produced today, only 600 of the units were of good enough quality to be sold.\u00a0 The other 25 units need to be reworked before sale or scrapped. This means that the good units expressed as time is 600 units\/100 units per hour = 6 hours. So the quality is;<\/p>\n<p>Good Units expressed in time (6 hrs)\/Performance time (6.25 Hrs) = 96% Quality<\/p>\n<p>So our final OEE calculation is<\/p>\n<p>Performance (89%) x Availability (87.5%) x Quality (96%) = 75% OEE<\/p>\n<p>This calculation shows that the total losses during the day for this machine were 25% which equates to 2 hours of lost production time.\u00a0 Over time, this adds up to a large amount of lost production time, therefore decreasing the profits that could be made if the productivity of the machine was higher.\u00a0 It is therefore very important to identify the root causes of this loss and to then implement the necessary measures to reduce or eliminate the losses.<\/p>\n<p><strong><a href=\"https:\/\/www.granta-automation.co.uk\/oee-calculator-tool-download\" target=\"_blank\" rel=\"noopener\">Click here to download your FREE OEE\u00a0Calculator Tool.<\/a><\/strong><\/p>\n<p>There are many ways of improving performance, availability and quality, some of which are outlined below.<\/p>\n<ul>\n<li>Performance of machinery can be simply improved by production monitoring systems that enable you to quickly identify, track and rectify faults or bottlenecks in the process. They also motivate workers associated with the process to hit targets.<\/li>\n<li>Performance and availability can both be improved by automating your machinery and production process. Automation helps to increase available working hours as machinery is not dependent upon an operator for it to keep producing products. <a href=\"https:\/\/www.granta-automation.co.uk\/types-of-automation\/robotic-palletising\">Robotic palletising systems<\/a> are a very good example of this.<\/li>\n<li>Quality can be improved by using vision inspection throughout your production process. Vision inspection during the production process enables you to identify and eliminate faulty products earlier in the process.<\/li>\n<\/ul>\n<p>If you would like to discuss the productivity of your machinery or factory in relation to automated palletising systems, one of our automation consultants will be very happy to help.\u00a0\u00a0<a href=\"https:\/\/www.granta-automation.co.uk\/contact\/\">Contact us<\/a> on 01223 499488.<\/p>\n<p>You may also be interested in our FREE Robotics and Automation Resource Pack that includes many other useful tools. It is available to download <a href=\"https:\/\/www.granta-automation.co.uk\/resources\">here<\/a>.<\/p>\n<div class=\"topbutton\"><a href=\"\/contact\">contact us<\/a><\/div>\n<p><!-- Whiteblock Bottom--><\/p>\n<div class=\"whiteblock2\" id=\"w2\">\n<div class=\"wpwhiteblockwv\">\n<p><span style=\"font-size: large;\"><b>Watch automation videos&#8230;<\/b><\/span><\/p>\n<p><a href=\"\/watch-videos\"><img decoding=\"async\" title=\"Watch Automation Videos\" width=\"300px\" src=\"\/images\/video-image.jpg\" alt=\"Watch\"\/><\/a><\/p>\n<\/div>\n<div class=\"wpwhiteblockwv\">\n<p><span style=\"font-size: large;\"><b>Find out more&#8230;<\/b><\/span><\/p>\n<ul>\n<li><a href=\"https:\/\/www.granta-automation.co.uk\/news\/how-can-i-improve-the-throughput-capacity-of-my-machinery\/\">How Can I Improve The Throughput Capacity Of My Machinery?<\/a><\/li>\n<li><a href=\"https:\/\/www.granta-automation.co.uk\/news\/how-to-define-the-value-of-intangible-benefits\/\">How To Define The Value Of Intangible Benefits<\/a><\/li>\n<li><a href=\"https:\/\/www.granta-automation.co.uk\/automation-project-payback-calculator\">Automation Project Payback Calculator<\/a><\/li>\n<li><a href=\"https:\/\/www.granta-automation.co.uk\/worldwide-impact-of-automation-and-productivity\">The Worldwide Impact of Automation and Productivity<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<div class=\"wppaltypes\">\n<div class=\"circle\"><a href=\"\/types-of-automation\/robotic-palletising\/palletiser-application-examples\/bag-palletiser\"> <img decoding=\"async\" title=\"Bag Palletiser\" width=\"160px\" src=\"\/images\/paltypes\/Bag-Palletiser-2-Lane-c.png\" alt=\"Bag Palletiser\"><\/p>\n<p>Bag Palletiser<\/p>\n<p><\/a><\/div>\n<div class=\"circle\"><a href=\"\/types-of-automation\/robotic-palletising\/palletiser-application-examples\/barrel-palletiser\"> <img title=\"Barrel Palletiser\" width=\"160px\"src=\"\/images\/paltypes\/barrel-palletiser-c.png\" alt=\"Barrel Palletiser\"><\/p>\n<p>Barrel Palletiser<\/p>\n<p><\/a><\/div>\n<div class=\"circle\"><a href=\"\/types-of-automation\/robotic-palletising\/palletiser-application-examples\/box-palletiser\"> <img decoding=\"async\" title=\"Box Palletiser\" width=\"160px\" src=\"\/images\/paltypes\/Box-Palletiser-2-Lane.png\" alt=\"Box Palletiser\"><\/p>\n<p>Box Palletiser<\/p>\n<p><\/a><\/div>\n<div class=\"circle\"><a href=\"\/types-of-automation\/robotic-palletising\/palletiser-application-examples\/crate-palletiser\"> <img decoding=\"async\" title=\"Crate Palletiser\" width=\"160px\" src=\"\/images\/paltypes\/Crate-Palletiser-2-Lane.png\" alt=\"Crate Palletiser\"><\/p>\n<p>Crate Palletiser<\/p>\n<p><\/a><\/div>\n<div class=\"circle\"><a href=\"\/types-of-automation\/robotic-palletising\/palletiser-application-examples\/tray-palletiser\"> <img decoding=\"async\" title=\"Tray Palletiser\" width=\"160px\" src=\"\/images\/paltypes\/Tray-Palletiser-c.png\" alt=\"Tray Palletiser\"><\/p>\n<p>Tray Palletiser<\/p>\n<p><\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>With productivity being a hot topic at the moment it\u2019s important to know how to calculate the productivity of your machinery and factory to enable you to implement and track productivity improvements. This article covers two productivity calculations.\u00a0 The first &hellip; <a href=\"https:\/\/www.granta-automation.co.uk\/news\/2-ways-to-measure-the-productivity-effectiveness-or-efficiency-of-your-machinery-or-factory\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[61,96,75],"tags":[102,103,207,206,233],"class_list":["post-573","post","type-post","status-publish","format-standard","hentry","category-company-news","category-updates","category-technical-information","tag-factory-productivity","tag-machinery-productivity","tag-measure-productivity","tag-oee-calculator","tag-productivity-calculator"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.granta-automation.co.uk\/news\/wp-json\/wp\/v2\/posts\/573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.granta-automation.co.uk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.granta-automation.co.uk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.granta-automation.co.uk\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.granta-automation.co.uk\/news\/wp-json\/wp\/v2\/comments?post=573"}],"version-history":[{"count":15,"href":"https:\/\/www.granta-automation.co.uk\/news\/wp-json\/wp\/v2\/posts\/573\/revisions"}],"predecessor-version":[{"id":2276,"href":"https:\/\/www.granta-automation.co.uk\/news\/wp-json\/wp\/v2\/posts\/573\/revisions\/2276"}],"wp:attachment":[{"href":"https:\/\/www.granta-automation.co.uk\/news\/wp-json\/wp\/v2\/media?parent=573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.granta-automation.co.uk\/news\/wp-json\/wp\/v2\/categories?post=573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.granta-automation.co.uk\/news\/wp-json\/wp\/v2\/tags?post=573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}